M8 | Woodside Viaducts Main Line & Slip Roads
Scheme Summary
M8 WOODSIDE VIADUCTS: OVERNIGHT RESURFACING WORK COMMENCES 31st OCTOBER
Amey, on behalf of Transport Scotland, are undertaking resurfacing and lining work on the westbound M8 Woodside Viaducts main line and its off-slip roads, between Junction 17 and Junction 19, from Monday 31st October until Wednesday 2nd November 2022. The work will take place between 8pm to 6am, each night.
This scheme requires a full closure of the westbound M8 carriageway for the extent of the works, with a signed diversion in operation.
Westbound traffic will be directed to leave the M8 at Junction 16 to join the A804 and from here travel to M8 Junction 19 via A804 Dobbies Loan, Newton Street and A814 Argyle Street before re-joining the M8 Westbound at Jct 19 where the diversion will end.
Local traffic at Jct 15 intending to travel Westbound on the M8 will also be diverted through local roads to join with traffic taken off Jct 16 at Dobbies Loan.
Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.
- A free Road Work Alerts service is available from our website: https://swtrunkroads.scot/roadwork-alerts/ An email address is all that is required to sign up for the service.
- To report a problem on the network please visit: https://swtrunkroads.scot/report-a-problem/
- Real-time journey information can be obtained by visiting https://www.traffic.gov.scot or via Twitter: @TrafficScotland