M8 Junction 15 Baird St Bridge

M8 Junction 15 Baird St Bridge

2 November 2020

Overnight Maintenance

INVESTIGATION WORK ON M8 BAIRD STREET BRIDGE COMMENCES 2nd NOVEMBER

Investigation and survey work on M8 Junction 15 Baird St Bridge will commence overnight from 10pm to 6am, each night, between Monday 2nd November until Tuesday 1st December 2020. The road will re-open as normal out with these times.

This essential phase of investigation and survey work will ensure the continued safe operation of the structure and inform any future maintenance schemes that may be required.

The work will be undertaken utilising a series of single lane closures of the eastbound or westbound M8 carriageway, and with full closures required of the on and off slip roads at M8 Junction 15. There will be no access for emergency vehicles during these full closures, although they have been consulted to allow them to make alternative travel arrangements.

This scheme has been planned in consultation with Transport Scotland, Traffic Scotland, the emergency services, Glasgow Royal Infirmary and Glasgow City Council.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

A free Road Work Alerts service is available from our website: https://swtrunkroads.scot/roadwork-alerts/ An email address is all that is required to sign up for the service.

To report a problem on the network please visit: https://swtrunkroads.scot/report-a-problem/

Real-time journey information can be obtained by visiting www.trafficscotland.org  or via Twitter: @TrafficScotland

South West Trunkroads on Twitter